Installation and wiring

Practical installation rules for Edge charge controllers and site controllers. Bus cable, addresses, jumpers, DC leakage wiring, CT clamps, P1 connection, and the checks after power-up.

View as MarkdownUpdated 2026-09-22

Work in the consumer unit and new circuits for charge points must be done by or under a qualified electrician under NEN 1010 (IEC 60364-7-722). The Dutch manual with photographs is at mycharger.edgetech.nl.

RS485 bus

Rule Why
Shielded signal cable, 3 cores ≥ 0.75 mm², for example YSLCY-JZ 4G0.75 The board expects an answer within 40 ms; a proper bus keeps reflections and dropouts away
Not Ethernet cable (Cat5/6) Wrong impedance and core size for RS485 at these distances
Bus topology, one cable passing every device Stubs cause reflections
No RS485-over-Ethernet or wireless Modbus 40 ms response window
Distances above 5 m: use the signal cable, not bell wire Signal integrity

Charge controller

  • Jumper top right: open = 16 A maximum, shorted = 32 A maximum.
  • Modbus address is 10 as shipped. Several boards on one bus get 10, 11, 12… via register 0x0200.
  • 1-phase installation: PE, N and L1 only; set PHASES bit 0 in the Settings register (or settings@<socket> = 0 from the platform).
  • Route N and the connected phases through the EVSE-X-DCD toroid. Not PE.
  • Mount so the board temperature stays below 62 °C in summer. Above that it limits to 10 A.
  • First power-up: the board self-tests earth, neutral and L1. A green blink about every 3 s means healthy.

Site controller SC-01 (clamps)

  • In the consumer unit, behind a fuse, on 230 V.
  • Clamps C1, C2, C3 on L1, L2, L3 of the main connection, arrow towards the load. Standard clamps up to 40 A; 50 A and 63 A clamps have a different ratio and must be selected in the app.
  • 1-phase site: one clamp on L1, on the same phase as the charge point.

Site controller SC-02 (P1)

  • Next to the meter, not in the consumer unit. RJ12 into the P1 port.
  • If the P1 port is already in use: powered splitter. If the meter delivers less than 250 mA: micro-USB supply.
  • WiFi 2.4 GHz. Hold the Mode pinhole 3 s to start setup, then pair in MyCharger.
  • Restart: pull the RJ12 for 3 s.

After power-up

Check Expected
Charge controller LED Green blink every ~3 s
Site controller in the app Online, firmware version shown
mb_quality in site status > 95 %
Plug in a car State B, then C when a session starts; current per phase visible
DC leakage test button (if fitted) Contactor opens within 300 ms, error bit 5 (value 32)